Completed Projects
0

Roller Compacted Concrete

Heeter Construction, Inc. completed these two projects:

1995 – WVDNR, Warden Lake Dam at Wardensville, WV. RCC completed in 75% of the allotted time.

1994 – WVDNR, Anawalt Lake Dam at Anawalt, WV. RCC completed in 25% of the allotted time.

Share and Enjoy:
  • Print
  • Digg
  • StumbleUpon
  • del.icio.us
  • Facebook
  • Yahoo! Buzz
  • Twitter
  • Google Bookmarks

Comments are closed.

Random Testimonial

  • No tweets available at the moment.

Powered by Twitter Tools