Heeter Construction, Inc completed the Local Water Supplies (3 extension systems) project. This $5,787,451 project ran through 2005-2007 and included 188,000 lf of water pipe.
Relocation State Rt. 10 Earling to Rich Creek at Man, WV, (2005-2008)
This was a project of 2,601,807cy of unclassified excavation valued at $19,065,785, and contracted by the WVDOT/DOH and completed to their satisfaction.
Heeter Construction, Inc completed the $1,864,880 Bee Run Recreational Dam project during 2004-2005 offered by the WVDNR.
[singlepic=11,200,150,,left]Located at the Wallback Wildlife Management district in Clay and Roane Counties, WV, the work consisted of 200,000cy of excavation, spillway, foundation, cut-off trench, drainfill and other related work necessary to construct a 15 acre earthen dam.
The $28,423,828 State Route 7, Powhatten Point, OH. project ran from 2001-2003 offered by the Ohio DOT
The General Contractor was Alan Stone Company, Inc., and Heeter Construction Inc. managed drilling, blasting and excavation of 6,264,092cy.
Heeter Construction Inc., in 2000-2002, contracted with the WVDOH, and completed the State Rt. 10 Huff Junction Relocate project at Man, WV.
HCI was contracted to excavate 2,324,800cy, drainage, pavement, etc with the contract amount of $18,658,342.
From 1999-2001, Heeter Construction, Inc., completed the WVDOH Relocate Project at State Rt. 10 Taplin, Man, West Virginia.
For the contract amount of $12,744,523, Heeter Construction, Inc excavated 1,766,453cy, drainage, pavement, etc.
Heeter Construction, Inc. completed these two projects:
1995 – WVDNR, Warden Lake Dam at Wardensville, WV. RCC completed in 75% of the allotted time.
1994 – WVDNR, Anawalt Lake Dam at Anawalt, WV. RCC completed in 25% of the allotted time.