Archive
December, 2008
Browsing all articles from December, 2008
0

Local Water Supplies (3 extension systems)

Heeter Construction TextHeeter Construction, Inc completed the Local Water Supplies (3 extension systems) project. This $5,787,451 project ran through 2005-2007 and included 188,000 lf of water pipe.

0

Heeter Construction TextRelocation State Rt. 10 Earling to Rich Creek at Man, WV, (2005-2008)

This was a project of 2,601,807cy of unclassified excavation valued at $19,065,785, and contracted by the WVDOT/DOH and completed to their satisfaction.

Random Testimonial

  • No tweets available at the moment.

Powered by Twitter Tools