Archive
December, 1995
Browsing all articles from December, 1995
0

Roller Compacted Concrete

Heeter Construction, Inc. completed these two projects:

1995 – WVDNR, Warden Lake Dam at Wardensville, WV. RCC completed in 75% of the allotted time.

1994 – WVDNR, Anawalt Lake Dam at Anawalt, WV. RCC completed in 25% of the allotted time.

Random Testimonial

  • No tweets available at the moment.

Powered by Twitter Tools